A survey of the management in the community: the flooding problemA case study at Hua Hin District, province, were conducted. 1) to estimate the percentage of people with comments on the causes of flood problem to know 2).Public education is. The population in the area is the problem of flood and success of Prachuap Khiri Khan, the number 52919 were randomized by random sampling systematic sampling, sample size 25 people
.It was found that the cause of flood, it was found that the cause of flood of respondents choose first. The heavy rain continued for a long time, the number of 10 people were 40.The 10 people were 40 tertiary is the design and drain, sewer, not enough of 8 people were 32 management flood problem of respondents choose first. Is.The 11 people, were the second is to improve the state of 44 river dredging (canal), a number of 10. คิดเป็น percent and is 40 No.3 The allocation of land use (avoidance of building construction in the way of flowing water), a number of 8 people.
.By methods of flooding problems in the community respondents to rate the highest priority level is improving the drainage system of 13.29. Followed by improving the state of river dredging (canal) at 13.17 and guidelines that respondents asked the minimum. The education and public information to the public. Community leaders have plans for flood management. Evacuation in case the area cannot avoid flood level. 11.88
.
การแปล กรุณารอสักครู่..