Morning notes on the meter and the gas pump. Cleaning and repairing air fan 7. Afternoon, milling, grinding and phone wiring at the fan to the lab for 3 machines.
Morning note the meter and replace gas tank cleaning and maintenance the fan 3270 number 7 machine. afternoon walk and the grinding room phone line to change the number of Labs fan. 3 machine.
In the morning, write down the wind, and change gas pump. clean and repair fan number 7 Ajarn the afternoon walk a line that the mill, and replace the fan number of the lab 3 Ajarn