According to the notification document, dated March 10, 2558 to the SC to resume construction ground floor 9 by a reinforced concrete from the beginning, but the SC has returned in a meeting that would change the way construction to provide a convenient and fast. more Is the construction of a post tension slab with beams. This is basically the same post tension, but later the SC has studied how the construction process and problems in the construction of such a system. I have made a request to switch back to the traditional way the project has already informed SI before, and so has to work faster and more convenient. I have consulted with the designer to modify and reduce the number of floors of reinforced concrete and beam down. To reflect on how it works. Therefore, the project has requested delivery fix the floor and beam, floor 9 to the SC to continue,
inter alia, the issues that the SC action until a conclusion is not to request an extension of time from the original. As previously discussed