Center for the 2008 Summer Olympics competition at the National Stadium in Beijing, which has the nickname of "bird's nest" because of the format, structure that is similar to the bird's nest [3] to create a stadium began in December 24, 1937. 2546 (2003) originally Chinese plan to use the stadium of the Olympic tournament at chatikwangtung. Thus, the stadium was built and completed in the year 1993. Thanks to 2544 (2001) Chinese change decisions and build a new national stadium in Beijing [4] Later, the Chinese turned to the national stadium design competition that will be built in Beijing. Herzog de Meuron, the Swiss company & Architekten AG. By concrete structures with stadium-like mesh, and can hold up to 90 people,0 people during the Olympic tournament. By the original architects design features description similar to the bird's nest, with an aperture in the ceiling at the airport a big contraction thanks over the stadium. However, in the year 1993. 2547 (2004) idea to have the ceiling shrinking has been canceled because of the economic and security reasons. The Beijing National Stadium, where the opening and closing ceremony 2008 Summer Olympics.
การแปล กรุณารอสักครู่..
