-Defining the coordinate system in the MSL. In the survey, called the Geodetic distance by scrambling stage is a stage grid Projection System, used to define a complex engineering survey coordinates system. A piece of land survey coordinates unit. In the survey, this time using the value of the coordinates link anchor. BMC.BMC pins at/BMD.. E/N = 887154.730 coordinates = 422405.500/Z = 5.490, pins/887151.190 = N coordinates BMD. E = 422418.480/Z = 6.05.
การแปล กรุณารอสักครู่..