Will be created to suit the size of the protective equipment and install phlung in the pond near the mouth of the pit, which is a mechanism used to control the security of every hole in this area, by initial as areas where there is a risk of contamination from the project activity by the pond hole area.Create a barrier to protect the concrete country water runoff from the concrete base, the mouth-hole wells flowing. Water runoff ponds area near the mouth of the hole may be contaminated with crude oil. Therefore, the project will make the runoff water pumping it into a separate status in order to separate crude oil out of the water, where the water has been extracted is stored in a water tank from the production process. To return to the compressor compressor water back to the hole. In addition, the execution of the project will provide employees perform monitoring on a regular basis in order to observe the water level inside the tank, and if water volume are found in ponds, 70 percent will continue.สูบน้ำไหลบ่าดังกล่าวเข้าสู่เครื่องแยกสถานะ ปริมาณน้ำไหลบ่าผิวดินบริเวณพื้นที่บ่อปากหลุมทั้งหมด เท่ากับ 3.28 ลูกบาศก์เมตรต่อวัน
การแปล กรุณารอสักครู่..
