In my section. I currently operate in the Assembly process stories that are coming in the next month, and I have submitted a document quality control process. For the twarot when the goods arrive, with Bell, and then.
On my part, I am in the process of assembling the product. Which is coming next month. I have documented procedures and quality control. For Century checked when they arrive to Bale then.
On my part, I"m the operation in assembly process products. Coming next month. And I sent the document quality control procedures. For the วรจ test when the goods arrive to the bell.