Contractors must prepare a summary document, close it, the number within the file series consists of 3
- Description: service stations, such as the Tana Lake location, photos, service station before the construction and after construction
- Scope of construction work
.- The plan of action and the personnel map
-CATALOG materials and equipment used in the arrangement
- Construction took place between David with barriers, guidelines for correct
- Technical data and test results,
- Planned to examine report available to sanitation system, the training and
.Employee care until there is an understanding in the system, check the form and system administration with a guide to the ngaraksa-fi
BA-BUILD AS DRAWING. Electrical systems, sanitary sewer systems, creative it, and so on.