1. The electrical shall be repaired and hang up overhead level. 2. All electrical cords, cables and hand power tools will be checked for frayed or exposed cords. 3. Connect the cable point shall be installed insulation tape.
1. The electrical shall be repaired and hang up overhead level.2. All electrical cords, cables and hand power tools will be checked for frayed or exposed cords.3. Connect the cable point shall be installed insulation tape.
1. The electrical Shall be repaired and Hang up overhead Level. 2. All electrical Cords, cables and Hand Power Tools Will be checked for Frayed or Exposed Cords. 3. Connect the cable point shall be installed insulation tape.
1. The electrical shall be repaired and hang up overhead level. 2. All, electrical cords cables and hand power tools will. Be checked for frayed or exposed cords. 3. Connect the cable point shall be installed insulation tape. .