Item 4. CCTV of DTS is not interface with CCTV system of C3 (Not necessary). The detail of cable routing/isolator location are identify in TCD already. In case DTS integration with PA system of C3, considered within the scope of STE responsibility.
ถือว่าอยู่ในขอบเขตความรับผิดชอบของ STE