Measures to prevent impacts from construction work continues exterior areas surrounding
1. installing the mesh fabric of the building to prevent fall materials. In this case, the mesh is installed by rpm, up from rooftop
. 1.20 meters along the opposite side. Chaidee mansion
2. to keep the remaining materials from construction and cleaning the area. In every day. On the rooftop floor
to prevent scrap material dropped
3.Define working hours in a specific floor rooftop, are working in the interval: 8.00 – 17.00 only travelers to protect and supervise construction worker
4. installing a temporary entrance doors, roof top (ST1, stair parts.2) governing and training workers to work on the rooftop floor
to prevent accidents from professional
.