A graphical representation of expenditure and construction periods, each period based on the fact that is the case the contractor is generally not a local construction contractor without cashflow.
The picture shows the costs and construction time. Each period by the fact If the contractor is generally Non-local contractors that do not have a turnover.
The picture shows the expenses and the use of construction period each period actually is the case contractors in general. No local contractors money circulation.