-A project of the Department of rural highway to traffic problems within the San kamphaeng district budget 100 million baht. This project is a three-Office of policy and planning, transport and traffic, (b) has carried out a study of the development of the railway network plan double Rails with a capacity of more than 200 per day with procession. The rail route connecting with the neighboring countries. -By the development plan in three phases by the path that is associated with the project, including the path, taphan Hin-Chiang Mai is in the planning phase III (year 2563-2567), 427 km distance. Help reduce energy consumption. Reduce the distance and the duration of the journey, as well as a link to the travel network. By now, the study is in the process of intermediate reports.
การแปล กรุณารอสักครู่..
