This research project to analyze and improve the performance of the staff within the warehouse and storage products to solve the problem by making the warehouse within the warehouse education production line pick up truck (70 R) influx of Motor Company.Co. , Ltd. has the objective to analyze the work of the staff is in the process of preparing an empty packaging parts night IP Brower Heater cord and glass front - backWith the situation after the update using Arena Simulation is measured after reducing the number of employees, and to create a base storage via Excel Visual Basic came to help in the work.Then, the information of the problem, study found that employees in unemployment for a long time to wait for the proceedings to be a bottleneck Point also found that the problem of data storage warehouse of yourself, do not have a storage of a warehouse.There is no equal to the number of actual products, lack of hand problems often
From the study the process that the research has brought the study of movement and time, and the main ECRS to improve the work of the staff in the Change process and use Arena before, and after a review of the work.Visual Basic to help in the warehouse inventory control within the operation that can be added to any of your employees to work as a result, the need to reduce staff.
การแปล กรุณารอสักครู่..