Design lowest point of each mining area to a pond to collect water. (Sump) to collect runoff water from surface mining in the same spot. Water and settling before being put to good use in the project area.
Design of the bottom of the mining area to collect each of the pond water. (Sump) to collect runoff from the mine at the same point. Service water and precipitation before will be useful in project area next .