1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 the training content in the control plan performance. To the employee by the superintendent performance
3.3. Practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.4 must have the inspection line gas, various joints, valves, various, good condition before use
3.5, electrical equipment, and other devices that use work to have the complete picture. And other equipment intact. The sticker passed state from maintenance. And allow the use 3
.6 install tray fire barrier flakes fire blanket with machines or combustible materials easy
3.7. Block area of operation, equipped with warning signs. And don't the irrelevant in the work 3
.8 provided the careful fire with fire extinguisher operation
3.9 wear PPE device with standard as specified (WI-SR-001)
3.10 arrange a ladder. Or scaffold in cutting on high
3.11 cables, various storage on rails hang up electricity or hanging by a hook S orderly
3.12 open warm moisture at least 2 - 5 minutes
3.13. Catch hold of the target to cut entirely stable. Development and support pieces remaining
3.14 on wind / gas line pipe belt to use, do not use wire
3.15 banning the use of pressure gauge damaged marketed
3.16 duct / pipe gas (AIR. O2,,N2) must be in the set, and to tie a rope or chain to together every time. And should not be set up near power lines. Oxygen pipe must not stained with oil or grease
3.17 when used in the gas tank pressure. Take the empty change immediately. Don't leave empty before work
3.18 provide good ventilation around the work
3.19 when cutting machine Plasma damaged to quit and return the store to repaired
3.20 provide scaffolding ladder or safe in the cutting. Plasma on high
3.21 lighting, light enough, in that light is not enough in the corner and dull and in place. It is considered high risk. If necessary, inevitable. Will be meeting planned thoroughly with the Department Safety
.