1. Regulations in a system's health. And safety related
PR-SR-010: control performance
2. Definition / contraction
No 3. Practice before operation, 3.1
The staff must be trained EHS
3.2 signal providers crane (Rigger) must have knowledge and trained
3.3. First performance on Mobile Crane controller to permit to work on Mobile Crane along attached a place. And the data of the crane
3.4 the training content in the Work Permit and control plan performance to employees. By controlling operation
3.5 crane used to pass the inspection of th 2)
3.6 have fire extinguisher installed in the crane
3.7 inspection and the size of the monkey dance gasket system Hydraulic electrical leakage of various state body, safety equipment and other that ready to perform lift
3.8 practitioners must provide personal protective equipment and inspection equipment, to prevent PPE various to intact before use
3.9 check weight to lift the comparison with Crane chart to stay in the Boom can get weight. And must give away from the ground as low as possible
3.10 check used communication tool that is in good condition. And workers team everyone understand the hand signals or radio
3.11 requires manual Operate Crane adjacent car operation
3.12 wear PPE device with standard setting (WI-SR-001)
3.13 audit trail, before departure, and the driving speed not exceeding 20 km / HR
3.14 inspection area. First set crane and check the condition around the crane while lifting, such as Outriggers that still intact without any abnormal conditions Other 3
.15 crane legs extended. And the crane with a sheet of aluminum / steel plate / sheet solid wood
3.16 blocking area with white flag - hoisting Red, warning
3.17 do not use other equipment Without accreditation, such as Pulley is strictly prohibited.Lifting, etc., Bar Sling Shackle
3.18 check height, width of the target to move
3.19 arrange in order. Support sling angle and sharp. Or may slip with pads or wood, and tie it
3 control specimens.20 check around the side before the lift to prevent accidents by direct or indirect
3.21 lifting vertically in the center of the set weight. Don't drag or motivate To prevent accidents that may occur from the induction of the workpiece. Including damage prevention of the monkey. And prevent damage.Potential
.3.22 in hanging with the head seized by the principle, to conform with the wire rope Eye
3.23 position of the signal. Must be visible from the driver derrick and is a safe point. (if the invisible. Have the wireless radio or the middle voice, assist in communication)
3.24 angle line of wire rope to lift the should not exceed the level 60 degrees. And hang things with body weight less than safe weight set
3.25 lifting workpiece speed raised shortly before the stop, when slightly high. To observe the slings and lifting equipment various while friendships, to ensure that the condition of safe. Thus, picking up
3.26 avoid lifting workpiece across the device working tank material various dangers, no staff, and those involved in the target the lift. Passengers on the workpiece or lift
3.27. Supervisors must closely
3.28 crane at the finish of the work and will be out of the working area. Go to the park in the area allowed
3.29 lighting, light enough. Are not allowed to raise in the light is not enough in the corner and dull and in a place considered high risk. If necessary, inevitable, will be the comprehensive planning meeting with the Department.