As a part of the MDF project t have installed conveyor chain conveyor for ash ash from energy plant for a period of one term found that there was a problem of bad design, some devices are always dip, such as ball bearings, gear,The chain causes Corruption very often
, which use approximately 1 year to scrap heavy repair, more than 10 times
.
การแปล กรุณารอสักครู่..