1. Change Smoke Detector room all
two. Wiring the editing room, according to the device's manual and engineering
3. Fixed line Loop SLC., With the shock
4. Replace the card Loop SLC. The damage has been
changed 5. Address Smoke Detector has damaged
six. Module change that have been damaged
seven. The new program
8. test system
การแปล กรุณารอสักครู่..
