1. a public utility building group-3 storey engineering building, including an underground water storage tank. -Waste water treatment buildings (part 1) 2 floors, including an underground water tank. -Waste water treatment buildings (part 2) 1st floor. -Building and waste (part 1) 1st floor. -Building and waste (part 2) 1st floor. -Solid waste business building (part 3) 1st floor.2. connect and Conference Center building. -Building a Convention Center floor 2 and a half sphere. -Bridge building at the Convention Center building 1 2 meeting. 3. civil works -Road works -Drainage system -Utility Corridor. -1 utility tunnel -2 utility tunnel -Cooling water delivery tunnel -Building A car park beside the Plaza works (Zone A) -Work and tunnel Plaza in front of the building B. -Work around the pool side, building B4. landscape architecture work (HARD SCAPE) -Fence around the area. -Soil and water wall fountain -Bridge walkway -LAN and the label project. -Landscape architecture Zone Master Plan