Since the project is installed MDF it ash conveyor chain tensioner for ashes from energy plant at one time found that there was a problem with the design is not good, some devices such as frozen water bearing, wheel,Article chains, such parts are damaged.
must be very often hard to repair, and more than 10 times from the time, about 1 years ago fraction
การแปล กรุณารอสักครู่..