Can contain passenger about 900 people in the procession, each with 3 carriage? There is, in essence, a 42-seat van and car control staff at the end of the head and the end of the procession
.Within the discharge door lock device procession emergency train for people by releasing the lock message by hand before the train doors open
in an emergency are fire extinguishers in each series 2 mini procession, and 1 set of each employee control
.Double tunnel system is a single tunnel tunnel 2 is connected in parallel to each other and the tunnel will be one way traffic tunnels are structures constant reinforced concrete that was designed to be a flexible style. Water protection system into the tunnel
Inside the tunnel are equipped with Rails running power rails railway corridor maintenance. Air suction system, ventilation equipment underneath the platform and the system detects
.Operational control center of the bus, performance levels. Working on a map.
การแปล กรุณารอสักครู่..