The result of the project's work. Study on the production process and locate the standard time in the process of producing acid water. I found that the original floor from the average 7.2 crates per hour, or spend time in the production of 10.67 minutes after the production process improvement has produced an average 10.2 crates per hour, or spend time in the production of 7.25 seconds, which made comparing the results to improve the production results were up from 29.41 percent original percentage.