While the mostly heroic Mr. Chai Chai sa kaeo, Director of maintenance and Jotham the Electricity Generating Authority of Thailand (EGAT.) indicates that such an incident does not affect the dam in Thailand earthquake Center from Sri Nakarin Dam about 663 km, 600 km Vajiralongkorn dams,the Bhumibol Dam 391 km and 491 km by EGAT.Track Check the condition of all the strength of the dam on a regular basis with the system installation to verify measured force stabilization Dam Area.
การแปล กรุณารอสักครู่..