Contractors must produce a document summarizing the file, close it, the number within the file series consists of 3
- Description: service stations, such as the Tana Lake location, photos, service station before the construction and after construction
- Scope of construction work
-The plan of operation and personnel of
-equipment supplies CATALOG arrangement
- Construction took place between David with barriers, guidelines for correct
- Various test results and technical information
-System monitoring, sanitation access plan with access to the report and training employees to understand
addressed in the system, check the form and system administration with a guide to the ngaraksa-fi
BA-BUILD AS DRAWING. Electrical systems, sanitary systems, More and more, it tube system.