8, when the contract for the construction of assets multiples. The construction of each asset is treated as a separate construction contract. If it meets the criteria above.
8.1. assets, each with a separate proposal.
8.2. each asset is negotiated separately. In addition, the Company and the customer can accept or reject the contract relating to each asset.
8.3. costs and revenues of the assets to tap three identifiable.
การแปล กรุณารอสักครู่..