According to Gap problem of Skirt Set, After ICLT & CMI had Re-Check Stock at IMIT (LCB) on Sep17, two thousand and fourteen We Have Found Gap NG of LH Front Skirt (Red) 7 pcs. (By Pre-Installation). Until Sep26 , 2014 ICLT have been informed by the IMIT (LCB) they have found NG gap for front LH skirt (red) additional 8 pcs. Found that NG was to Re-Check Front skirts with rear Body (40 sets) at CMI on Sep19, 2,014th. Below is The Result of Re-Check Stock from CMI, IT does appear Not The Result of NG gaps of Front Detection skirts.
การแปล กรุณารอสักครู่..
