With each step, there are several machinery manufacturing machine that can manufacture a piece, and each machine can have more than 1 phlin products which parts must be produced in accordance with production process not only can skip the previous route. By calling in this manner that the scheduling of the flow.
การแปล กรุณารอสักครู่..