10. rent a range of text. People renting a tenant consent to take the land or the building. Buildings where tenants construction into the soil removed rent range, but only the companies in the Group and/or the tenant leases within a period stipulated in the contract. But it must be consent from rent.
การแปล กรุณารอสักครู่..
