This research project to analyze and improve the work of the employees working in the warehouse and storage solutions within the warehouse by a study of the production warehouse pickup (R70) of General Motors company, Jensen's generation (Thailand) co., Ltd. with the purpose to analyze the work of the employees in the process to pick up the pieces. Return the empty packaging Prepare wiring Heater and windscreen – IP Brower, and improve performance by comparing the current situation from the situation improved after using Simulation as a performance Arena, after reducing the number of employees and has created packets.Visual Basic Excel with access through the bakhomun to help in the work. This research begins with a study of the working conditions of the company on the basis of experienced help to point to the problems and the selection problem. Then study the data of the problem. Which found that the employee has available for a very long time to hoist the process bottlenecks. It also found problems with the information store of the warehouse itself does not have a storage of the warehouse itself. But it relies on data from the system, which is sometimes a waste, cutting the number of items in the system. Is not equal to the actual number that the item is missing a hand problem. From the study of such processes. Therefore, the main researcher studying the movements and time and ECRS in improving the work of the employee. By changing the working procedures and inspection prior to use of the Arena and use Visual Basic Help in controlling access to the items within the warehouse. The performance appear to be able to add functionality to the employee. As a result, reduced staff requirements.
การแปล กรุณารอสักครู่..
