Keep the job done work items Defects dining room The Garden parts of water leakage between the dining room (The garden)
กับ restaurant before. (Agora), which is a problem from the beginning when the delivery from the company, Keon house, contractors have
.Try to solve the problem, but not until the present. And to comply with this time the hotel can't
closed restaurant to ผู้รับเหมาเข้ามา papers. And the hotel will fix it. By the way as follows:
1.Ceiling opening underneath the gutter to watch for the heavy rain. Or use the water injection in quantities large enough to see the roof leaks
2. Repair leaks by that point saw
3. Test points of long absorbed by rainwater or spray water again.
4.If there is a leak, then close the deposit and painted
in the repair of this time. Must have cost happened
1. Labor repair all
2. The material
by ใช้จ่ายทั้งสอง evaluation items, 25 000.00 baht (twenty-five thousand baht)
so learned, please consider and command the next
.
การแปล กรุณารอสักครู่..
