Malaysia has confirmed the commission by 2 units, including the commission to solve
flooding (The Permanent Flood Commission Committee) for flood relief in the long term and
the Commission flood (The National Flood Relief Committee) to reduce flooding are going.
occur in the future It was planned as a two-level plan is healing flood (Curative) and
flood prevention plans (Preventive) The plan was to take the remedial measures taken by the flooding of the
building (Structural Approach) for long-term solution as follows.
การแปล กรุณารอสักครู่..
