Today, the project has been discussed and the meeting in conjunction with the construction of the project, the team has concluded the following:In this collection of 16 rooms (2903) is a task that can be performed.-Tiled flooring, laminate-Kitchen-WC in bathroom-WallpaperAnd a set of entries that could not be carried out. On the day of 16 is.-Installation of all glass suite-Air conditioningNote: the basics In visits to his bedroom on the 16th July
การแปล กรุณารอสักครู่..
