Suggestions.• The Cabinet should change within a DB TH24 and electrical all new Branch Circuit Breaker for your and add with TH25.• The device should be changed to the new LP TH24 section and all Branch wires sizes 10 63A MCB Sq.mm. standard on line 2531 (1988) 10-11 tiss Sq.mm. wiring and metal pipes buried in the soil. Can stream size should be changed so that 50A MCB up 50 AT (except the power circuit to the motor according to the calculation details).• Cabinet and the Cabinet should be changed to TH25 DB electrical equipment within the new Cabinet.• The device should be changed to LP parts, all new TH25 and MCB 63AT Branch cables according to standard size 10 Sq.mm. Devil TIS 11-2531 (1988) line 10 above Sq.mm. non-metallic pipe in soil can get A current 42 MCB change size tripods with size not exceeding 40AT (with the exception of the motor cycle, according to the calculation of the flat).
การแปล กรุณารอสักครู่..