2. Flooring at the entrance - out Side in the factory canteen. Please repair damaged concrete repair department by placing concrete to ground level to prevent falls falter.
2 straight out. Cafeteria side within the factory. Faulty concrete flooring. Repair Department. Please repair the concrete floor and the new level to prevent walk-free fall.
2. The floor at the entrance to the cafeteria on the side within factories, please repair concrete repair department is damaged by the new pour concrete, floor level. To prevent tripping to fall