A study of statistical programs used to analyze the cause of delayed work on the construction project water storage tank size 8000 cubic meters with internal pumping system, LAT krabang industrial estate.
A study of the statistical program. To analyze the causes of delays in the construction of a water tank with pumping 8000 cubic Estate Lat Krabang, Bangkok.
Study on Application of statistics. To analyze the cause of the delay in the construction of a water tank size 8000 m3. With injection system within the industrial estate).