Tell them about Timing when the Design Change to Confirm compliance with the Free access Zone and therefore Confirm Timing has been changed from the original 3 weeks in advance and must Confirm changes to Confirm before 10 weeks as shown.
Confirm Timing when notified about a Design Change to comply with the Free Zone so the change from the old to Confirm Confirm Timing three weeks prior to switching to Confirm before 10 weeks following.
The Confirm Timing when Design Change to comply with the Free Zone so it is เปลี่ยนการ Confirm. Timing from the original to Confirm advance 3 week change to Confirm beforehand 10 week as shown.