Bay area jobs page 3 check with the conical funnel Assembly layer 1 and Layer 2 appears when using the water level, there is a long drop system and Groove away. 12mm.
Check the door at Bay 3 with welded cone to cone connection layer 1 and layer 2 appear when the water level is laid long ago did away with groove 12mm.