This study reports a cooperative project to improve the production rangkrachok piece rear door of the car to create a continuous flow. Where is Summit auto-body industry co., Ltd., who prepared the study on project trail the flow of raw materials that cause a stop and found the problem that caused the non-continuous flow of finished work pieces. Shield them from it, thus causing the stop of the process and the process of inventory and transport distances that are not necessary.
การแปล กรุณารอสักครู่..