Project and detailed design for construction waste disposal centre in order to produce electrical energy (in part of the feasibility study of the project) to supply the area with possible and appropriate for the establishment of a waste disposal centre in order to produce electric power for at least the amount of space from a potential area 3 to manage solid waste to produce energy has considered that the development of knowledge in the field of waste processing, power, and has performed as a template for local governments in the areas of agro.Boprung waste management system currently available, fully integrated from the source to the destination, a powerful compression. Based on the maximum utilization of all steps, especially organic waste waste category has a natural digestion and waste plastic, which is a removal method by hard will be reused in the production of renewable energy, which will help to slow down the construction of power plants from a fossil fuel alternative. It reduces the release of greenhouse gases, which cause global warming problems.
การแปล กรุณารอสักครู่..