Every day there will be a meeting of the progress report.To help solve the problem. It seems that this week I'm going to get the coding problem. A week of coding, it provides the tools you need to write. Such as whether the install version 12.04. ofbiz, pgAdmin III and galileo version Elicpse. And the settings of the system, with the system in the khom Mac OS. But it is also incomplete because installation is quite difficult. This week, it is still not fully installed 100 percent. I had a chance to code training with development teams and senior Controller View Model about SA. This coding has been described as the typical split into sections. Senior Programmer, described birt report about coding and start with how process operate. And what parameter (s). However, coding By describing in detail the type line per line. After completing the session in 1 week there were estimates and conducting work. By writing a report page based on the good side, that have been designed to.