The reservoir canal port opera house the 1 tha ngio, tambon tha ngio District Huai yot, catch a cold
the Royal nest:
King
background of the project. :
.The tambon tha ngio tambon Nong Chang sail and tambon Huai her. A Book of the royal building reservoir and irrigation system on 25 September 9 the singer 2532 later for a letter. รล 0005 / 3231 dated March 2 2533 informed the Department ofThat brought the inform know how to please me. To get reservoir project canal tha ngio as project due to initiative
.The location of the project:
head dam located on the canal Khlong tha ngio tha ngio in tambon Khlong tha ngio District Huai yot Trang
the construction period 7 years. (2537 - 2543 capacity 18.50 million cubic metres
. Objective:
1.To serve as a source of water. River Valley area Kuan, glass stone, above the falls yard gate. For resources and cost of making agriculture area, about 12700 Rai, the dry and water shortage in the rainy season. Or in the rain season cultivated plains, tambon tha ngio tambon Nong Chang sail and tambon Huai her.
2.To serve as a source of water for drinking - consuming in the dry season or the people suffer trouble due to the lack of water for approximately 22 village. In 3 District mentioned above. Subdistrict and nearby can help
.3. To promote the well-being of the people in the area. To benefit from the project. The company is better supported by the water. Which is the basis of productivity in agriculture, tourism, etc. 4
.To increase the fertility of Forest Watershed The volume of water in the reservoir can raise the groundwater forest watershed area Constant moisture of forest resources nature
5.As the water soil for water supply of Huai yot District in the future.
การแปล กรุณารอสักครู่..
