Wiring and installation of electrical equipment in the building.1. electrical wiring1.1 late ChairmanMust use insulated rain resistant and sunlight-resistant are the size and coordinates as given in the table, but must not be smaller than 1103 g 4 table, mm?1.2 lineMust have the size and coordinates as given rounded the table but must not be smaller than 1103 g 4 table, mm?1.3 wiring within buildings.A. this wiring use only residential and commercial buildings.ข. size and line coordinates must be in accordance with the table at page 1103 g but there is no need to cut smaller than 2 square millimeters.C. the size and coordinates of the other sub-saiwongchon shall be in accordance with the table at 110.3 g.Discography. The installation of electrical equipment in damp or rain must be waterproof.The metal part of the touch, electrical equipment, including switch panel will need to be plugged into soil.F. The size of the outlet flow head plug The switch must not be less than the dimensions and coordinates of line defined in 1103.Chor Light line cord? Double Rope wire type that uses the various types of electrical migration. never walk close to the wall or ceiling of the floor cover is required for internal wiring hanging lamp Sun sun lamps or appliances to migrate.SOI wiring in a wooden table.In this wood, wiring, use only in a dry.Chaw-Ka-Cher. The wiring on the anchors prakapTo protect the wiring on the output specification size must not exceed six square millimeters and wiring, do the following:During a period not to exceed 150 cm prakap anchors.The length between the electrical wiring not less than 2.50 cm.The length between the electrical wires to the construction not less than 0.50 cm.Headquarters The wiring on the massThe wiring on the mass, size must not exceed 70 square mm and wiring, do the following:Period during mass not exceeding 250 cmDuring the period not less than 10 cm power cable.The length between the electrical wires to the construction not less than 2.50 cm.Impressionist. Wired on lukthuaiWired on lukthuai Wiring:Stage mass not exceeding 500 during a lukthuai cmThe length between the electrical wiring is not less than 15 cm.The length between the electrical wires to the construction not less than 5 cm.In 3 hours 3. The above. The need to pass through the weave construction, such as walls and floors will have to prevent exposure to the construction by use of non-insulated fire-resistant type cables and not% moisture. With the length of the casing is at least equal to the thickness of the construction.T. to island wall wiringThe airline that flies to the island, the walls must be insulated wires which are lead casing or casing.The plastic casing of a Terminal master's degree or some other similar-quality outer sheathed. A late lead and plug casing must be careful not to cut out the lead-free part to offend the insulation-covered wire. To adhere to the walls will need to use a belt or a nail catcher 2 legs caught the line exclusively.The line passes through a building must have a casing that is electrical insulation, wear, or otherwise route, but if that is a metal construction is a casing that is electrical insulation type insulation cover to protect the wear strength tear or become dangerous.If using aluminum belt type strap handle. The airline must be no more than 10 cm away, turning corners. Must have a radius of curve in no less than 5 times the width of a string?Cover wiring Island Rd.Need to use a string type of handle grip designed specifically. Not more than 1 metre away from the box, plug or switch, or an appliance does not exceed 30 cm cord turn the inner radius of the curve must have at least 5 times the diameter of the wires. Plugging in the appropriate wiring box. At the end of the cable is plugged into such things as wiring switch box must be appropriate to.Suite. Embedded in the walls of a building wiringAirline travelers must be embedded in the wall building wire insulated with external casing manufacturer types recommended for embedding in the wall.
การแปล กรุณารอสักครู่..