Process trash.1. wooden structures, size 4x4x70, came on the floor by tilting 80 degrees.2. apply wood based on size 4 pieces come 1x4x25 based on the four sides are used, screw tightly.3. apply the secondary wood trash can size 0.5 x 25 x25 on the lower base of the structures forming the infrastructure for secondary waste.4. apply wood row 1 x 0.5 x 3 long, 25 4 pieces to come based on the four sides are used, screw tightening.5. bring the long row of wood 0.5 x 4 verse 3 x 26 comes based on the four sides are used, screw tightly.6. wood level 4-16 will be increased to 0.5 x 1 verse 3 x 40 cm in size is based on the four sides using screw until the 13 pieces.7. apply wood holder size 1x4x40 4 pieces come with chrome holder, creating four sides using screw.8. bring the painting to beauty.