, which caused the machine maintenance preventative didn't examine the state machinery standards at the place. Cause of failure was 26 cost, machinery345 baht (from a backup parts the safest labor overtime). And the cost increase of employment is to repair the machine. (a case that could fix yourself) increase the walking machine was 99.89% with the average time between the damage of the machine, as 35 026.67 minutes. The implementation of preventive maintenance machinery used will need to practice according to the plan. Standard program and placed in Microsoft Excel strictly. It can reduce the breakdown of machinery.To focus on the inspection condition. And record machine. To make the preventive maintenance machinery effectively.
การแปล กรุณารอสักครู่..
