4. Target
.The installation of the Internet system Wifi district (community) in the pilot areas within the county, municipal As the source of research boundaries of people, youth, tourists and staff staff government services.The process as follows:
.- transmitting equipment Rocket M5 with pole amplifier sector
- signal distribution equipment type surround Pico M2
- equipment receiver. NANO Station M5
- SW equipment, expand connection point signal
- Rock Manage Device
- ROE equipment pay electricity through UTP line Cat5e
.- pillar based on equipment - signal
- equipment connected ADSL a Mutiwan
- Router equipment the signal boxes ADSL
-
- installation electrical equipment. Signal transmission
- the SETUP system with database management
.Machine size, SERVER supports User 1 500 User
- Authentication System Software
- late UTP Cat 5 e outdoor
(by installing the system. Wifi community by the system can be connected CCTV)
1 5. Mode of operation.Preparation of a survey using the Internet community of people in Bangkok municipal
2. สำรวจความหนาแน่น of citizens who want to use the Internet
3. Coordinate map taxes. Finance Division in the survey area 4 preliminary
.Prepare project to obtain approval
5. Coordinate agencies / store / company. In a bid to proceed according to the procurement operations in India.
6 approval to install Internet community (system. Wifi community)
7.The public service with satisfaction to the people and assessment services Internet system Wifi community) of the district (municipal). After service 8
.Assessment report of satisfaction to their supervisor. Along with the perfecting system Internet ready to use all the time.
การแปล กรุณารอสักครู่..