3. the construction of reinforced concrete is the most permanent operation in the end of the Lam or signs of water. It is possible to trap sediments and catchment in the dry season. Construction fee, depending on the size of the Lam, which should not exceed 4 meters wide.
การแปล กรุณารอสักครู่..