Seal is red. "The urgent document approved temporarily to change the foundation - Urgent Document"
with signed approval from IMR or who has been assigned.
documented between import system, or between the fixing
.The copy of the attached document in the leaves add / change / cancel document control (F05-DC003)
seal along sign and date.
การแปล กรุณารอสักครู่..