Due to port. Krabi is necessary to improve and repair the area near the mouth of the Changjiang (hopper), a new technical advisory teams and contractors. The duration of demolition and installation of hopper, which will from time to time in the operation of this area is approximately 15 days from the start date 1-15 July and 2558 (2015) will affect the yipsam ore handling operations to the direct ore conveyor.At the same time, the port authority would study a copy of this message to the relevant authorities to be aware of the inconvenience.
การแปล กรุณารอสักครู่..
