2. structural welding inspection the details of steps in the work process Inspection before welding. 1. Inspection on cleanliness of steel plate area to make connections. As a check the availability of steel plate to weld. By connecting the area to clean.Rust-free. Smooth rough edges of steel plate. There are no welded defects. 2. Check the wire connection Welding wire used must comply with the requirements of the process of welding (WPS) and must have a label telling the type and.The standard of welding wire. 3. Check Fit up Is checking the work piece to check the accuracy of the various stages along the way or according to?The standard defines a separate audit criteria according to the type of welding.Welding time checking Check the first welding (Weld Root) As the first welding inspection Typically used to investigate the structure required a special strength, such as checking links hull Block etc, how to monitor and benchmark, including the form data will be used as a Final check on Weld to the next topic. Checking back links Check the welding is completed (Final Weld) is to make sure that the welding defects and size are acceptable or not based on the standard criteria. Which the defective joints described in this issue of knowledge management are often as bad bugs can be seen frequently by the split of the authorization header. As follows: 1. Check cleanliness -Welds must be free of slag and spatter with the length or diameter of 1/8 inch over the year. 3. the condition of the road surface damagedEconomic data and surveys, it must consider the suitability of each entity that is responsible, because each unit has a couple bites of the readiness statements of quantity in the operation. Personnel, as well as tools to explore a different data store. Development of guidelines for how to survey and assess the damage of the operational guidelines have been summarized to survey and assess the damage. There are two types together is to assess the initial damage and assess the damage. Survey the damage. Perform only the surface rubber ramp to survey damage quantity in each type of damage. In order to analyze how the budget analysis and maintenance for maintenance management evaluation of existing monitoring data and repellent damage and form validation and assessment of damage of the cable way to benefit the practical usage summary of damage as follows:It can reflect points of damage from the selected path is used as an agent that manages to score a classy NAPA v cable road damage. Path SOI saladaeng moderate damage scale and trim routes, golf courses, there are no damages, which is a preliminary case study to use in analysis, how to, maintenance and repair budget analysis, to enhance and increase durability, longevity even more here.Recommendations from the survey of living conditions of the damaged road surface to push tea. Data from the survey of living conditions of the damaged road surface if all storage detailed information of damaged and all distances (Station) to make the data in the survey, reflecting damage and select the appropriate path for the plan. Update Repair and allocate budget more appropriately in order to assess the damaged road surface's preliminary and detailed breakdown should assess damage, To select a short path to understanding and improving the score breakdown because it allows to save time in the preparation of the survey data to plan repairs and adjustments to allocate budget more quickly.4. check the electronic Panel.งานวิจัยนี้ศึกษาการตรวจสอบในกระบวนการผลิตแผงวงจรอิเล็กทรอนิกส์ โดยพบว่ามีของเสียได้ถูกส่งไปยังลูกค้าจานวนมากของเสียที่พบมากกว่า 80 เปอร์เซ็นต์สามารถมองเห็นและตรวจพบได้ด้วยสายตา จากผลการวิเคราะห์ระบบการตรวจสอบเดิมพบว่าผลการตรวจสอบขาดความถูกต้องและการตรวจสอบซ้าให้ผลไม่เหมือนกัน พิจารณาได้จากค่าประสิทธิผลด้านไบอัสและประสิทธิผลด้านรีพีททะบิลิตี้มีค่าเท่ากับ 43 เปอร์เซ็นต์และ 47 เปอร์เซ็นต์ ตามลาดับ ซึ่งไม่ผ่านเกณฑ์ที่กำหนดไว้ที่ 95 เปอร์เซ็นต์ จึงได้ทำการปรับปรุงระบบการตรวจสอบและประเมินผลพนักงานอีกครั้งค่าดัชนีความมีประสิทธิผลทั้งสองดัชนีเพิ่มขึ้นเป็น 97 เปอร์เซ็นต์ หลังจากวิธีการตรวจสอบที่พัฒนาแล้วได้ถูกนาว่าใช้และกำหนดเป็นมาตรฐาน แผนการสุ่มตัวอย่างจึงได้ถูกนามาใช้ในตอนท้ายของกระบวนการผลิต แผนการสุ่มตัวอย่างที่ใช้อยู่ในปัจจุบันเป็นไปตามมาตรฐาน(AmericanNationalStandards Institute/AmericanSocietyofQualityControlZ1.4)แผนนี้ได้ให้ค่าขีดจากัดด้านคุณภาพของการตรวจสอบ(AverageOutgoing QualityLimit : AOQL) เป็น 0.0147 เปอร์เซ็นต์This case study requires a lot of levels after checking that 0.005 percent, has proposed a new design-the sampling plan that has a tick bite and the quality of 0.005 percent, check, and then displays a comparison between the performance of the sampling plans with operating curve sampling plan (OperatingCharacteristicCurve: the OC curve) and audit costs. The curve was found to perform the sampling plan na offer verification between the lot and the lot was clear over the sampling plan. Audit expenses fell 50 percent from the current sampling plans.
การแปล กรุณารอสักครู่..